Mumbai Metro Rail Corporation to charge up to Rs 5.4 lakh to obtain NOC for construction activities

Mumbai Metro Rail Corporation to charge up to Rs 5.4 lakh to obtain NOC for construction activities

MMRC said obtaining its prior permission/NOC is mandatory for construction activity falling within the influence zone of the underground Mumbai Metro 3

Mandatory NOC for Metro 3 Construction Activities

The Mumbai Metro Rail Corporation (MMRC) has announced that obtaining prior permission, or a No Objection Certificate (NOC), is essential for any construction within the influence zone of Metro Line 3. This regulation is in place to ensure that new construction does not compromise the safety or structural integrity of the underground Metro system and its infrastructure.

All NOC applications will be subject to technical scrutiny and verification by a designated agency to ensure compliance with safety standards.

MMRC said a 30% reduction in the applicable fee would be offered for revised proposals submitted for revalidation of an earlier NOC. For proposals that have already received an NOC but require revalidation, a concession will be available. Applicants can access detailed guidelines, the application procedure and other relevant information on MMRC’s website. The notice has been issued by the director of planning and real estate development department of the MMRC.

Leave a Reply

Your email address will not be published. Required fields are marked *