New Delhi: Delhi Development Authority (DDA) has completed contruction of 645-vehicle multilevel parking facility at Bhikaji Cama Place District Centre, scheduled for inauguration in the first week of Nov 2026.
The Rs 40-crore facility is receiving finishing touches. Its parking capacity includes 424 cars, 193 scooters, 20 designated spaces for persons with disabilities (PwD) and eight adapted scooter spaces,” said officials. Initiated under LG TS Sandhu, the project aims to resolve parking shortages, reduce roadside parking and ease congestion at the busy South Delhi commercial hub and adjoining roads. “The facility comprises a basement, ground floor, two upper floors and a terrace, connected by an internal vehicular ramp. To ensure smooth traffic flow, the authority has planned separate entry and exit points, directional signage, and road markings. The facility features nine EV charging points, electronic payment options and an automatic sensor system for parking space availability.
Earlier, DDA also shared plans to establish 232 surface parking lots by the end of this financial year. You Can Also Check: Gold Rate in Delhi | Silver Rate in Delhi | Bank Holidays in Delhi | Public Holidays in Delhi | Delhi AQI | Weather in Delhi | Petrol Price in Delhi | Diesel Price in Delhi | CNG Price in Delhi | LPG Price in Delhi Stay updated with the latest Delhi news. “The project forms part of DDA’s broader initiative to create structured parking infrastructure in commercial areas and district centres to reduce roadside parking. Download the TOI App.
Amenities include four passenger lifts, two 50-capacity waiting halls, drinking water and separate restrooms.
The facility is designed to provide safe, organised and accessible parking for visitors to Bhikaji Cama Place, one of South Delhi’s prominent commercial centres, according to DDA. Officials stated that a connecting tower with a lift and bridge will link the parking lot to the raised plaza. This improves pedestrian access, allowing visitors to reach their destinations without navigating traffic or surface parking. Accessible parking spaces and all-floor lift access ensure seamless movement for persons with disabilities. Safety features include firefighting installations, fire-check doors, a fire-escape staircase, basement ventilation, lighting and power backup. Rainwater harvesting and landscaping of the surrounding area are also part of the project. It is expected to benefit office-goers, visitors and businesses by improving parking availability and traffic circulation in the area.

