File picture
Hyderabad: Skyroot Aerospace is gearing up to complete the shipping of its Vikram-1 rocket to Sriharikota for its second test flight by the end of Nov, and expects to go fully commercial with its third mission, the space startup’s co-founder Naga Bharath Daka told TOI .
From our third mission, we will go fully commercial,” Bharath said. “By the end of the calendar year, in Dec or early Jan, we hope to launch our second test mission.
Skyroot flagged off the first-stage hardware of the next Vikram-1 rocket to ISRO ’s Satish Dhawan Space Centre towards the end of Aug. “Just 36 days since Vikram-1 launched, the hardware for our next launch is en route to the launch site. Vikram-1 created history on July 18, when Mission Aagaman became the first privately developed Indian orbital-class launch vehicle to reach low Earth orbit. The rocket lifted off from Sriharikota and placed its payloads in a 450-km orbit. MaxQ, near the Rajiv Gandhi International Airport at Shamshabad, the second test-flight rocket is being built at the company’s 2 lakh sq-ft Infinity Campus While the first Vikram-1 was manufactured and shipped from Skyroot’s headquarters.
You Can Also Check: Gold Rate in Hyderabad | Silver Rate in Hyderabad | Bank Holidays in Hyderabad | Public Holidays in Hyderabad | Hyderabad AQI | Weather in Hyderabad | Petrol Price in Hyderabad | Diesel Price in Hyderabad | CNG Price in Hyderabad | LPG Price in Hyderabad Stay updated with the latest Hyderabad news.
Team Skyroot keeps building and building — from India to the world,” Skyroot co-founder Pawan Kumar Chandana had said in a post on X at the time. In July this year, Skyroot became the first Indian private firm to launch an indigenously built orbital-class rocket into space and place a satellite in orbit. The mission validated Skyroot’s carbon-composite structures, solid propulsion stages and 3D-printed engine technologies. Download the TOI App.
The company had already begun work on its second Vikram test-flight rocket even before the maiden orbital mission, while the first rocket was being readied for launch at the ISRO spaceport. The facility, inaugurated by Prime Minister Narendra Modi in Nov last year, is designed to eventually support a launch cadence of one rocket a month.

