Western Railway is poised to enhance its infrastructure by adding: The wider industry impact

Western Railway is poised to enhance its infrastructure by adding: The wider industry impact

Western Railway is set to enhance its infrastructure by adding four new platforms as part of its capacity augmentation initiative. This expansion includes two platforms at Borivli, one at Andheri, and one at Virar. The goal of this project is to alleviate congestion and facilitate increased suburban train services to Virar. The new platforms will be integrated with ongoing expansion efforts at these three stations.

Western Railway is poised to enhance its infrastructure by adding: The wider industry impact

Both platforms will be about 330 metres long and seven metres wide. (AI image) Virar will receive an additional platform under the fifth and sixth-line project. The new infrastructure is part of Western Railway’s capacity augmentation works aimed at supporting increased suburban train operations and services towards Virar once the required works are completed. (AI image) Andheri, which handles about 4.5 lakh passengers and over 1,000 suburban train movements daily, will see expansion in two phases. Phase one includes extending platforms 4 and 5 southwards, enabling reversals from platform 5 towards Virar. (AI image) Phase two at Andheri will add a 12-coach double-discharge platform alongside the sixth line.

At Borivli, one new platform will be built as part of the fifth and sixth lines between Borivli and Virar. Another will come up on the south side for the Harbour line extension. The new platform is planned to improve passenger exits towards Andheri East, forming part of the station’s broader expansion under the capacity augmentation works. (AI image)

Western Railway is poised to enhance its infrastructure by adding: The wider industry impact

Leave a Reply

Your email address will not be published. Required fields are marked *