Tag Archives: Orange Line
Kolkata: Work to bridge the last 56 metres of the Orange Line’s viaduct gap at Chingrighata
Kolkata: Work to bridge the last 56 metres of the Orange Line’s viaduct gap at [...]
23
Oct
Oct
People must cross the Bypass at Metropolitan crossing or Mathpukur now to reach Beleghata
The construction of a foot over bridge at Beleghata metro station that will provide easy [...]
04
Oct
Oct
Trial runs on Beleghata-Sector V (IT Centre) stretch of New-Garia: The wider industry impact
Kolkata : Trial runs on Beleghata-Sector V (IT Centre) stretch of New-Garia Airport Metro corridor, [...]
27
Sep
Sep
TOI reported on Aug 16 that after more than six years, the city’s Orange Line finally crossed
On Thursday, Metro Railway successfully conducted the ‘push trolley’ inspection on the Beleghata (Metropolitan)-IT Centre [...]
21
Sep
Sep
Bengaluru’s double-decker flyover plan confronts a possible: The wider industry impact
The move could bring an end to the prolonged uncertainty over the road-and-Metro project, with [...]
17
Sep
Sep
A 19-year-old was taking a Boston train for the first time when his girlfriend fell onto
Family of man killed after falling on tracks at Forest Hills T stop speaks to [...]
01
Sep
Sep
